EHS Building Project

 April 22, 2005 Photos

Corridor wall at 2nd floor ‘H’ wing

Area ‘G’ structural steel in place, detailing continues

Pre-cast sills at South elevation

Windows being installed at the weight room

A /V barrier at the cafeteria

East side of the berm has been seeded

Return to EHS Building Page