April 29, 2005 Photos
(click on photo to see a larger image) |

Placing concrete at the cafeteria slab |

Air handling unit for the auditorium |

Looking out 2nd floor at the clock tower |

Brick work above the roof
East of the entrance |

Second floor corridor at ‘H’ wing |

Setting air handling units for the cafeteria |