EHS Building Project

March 25, 2005 Photos
(click on photo to see a larger image)

Installing the 20,000 gallon cistern
for fire protection

Structural steel started 3/23/05
at the South wing of ‘F’

Prep for slab on grade
in areas ‘A’ & ‘E’

Walt waiting for the
cafeteria to open

Return to EHS Building Page