EHS Building Project

 May 6, 2005 Photos

Corridor walls first floor ‘H’ wing

Veneer at the front entrance

Openings for skylights at the cafeteria

Block filler started at the boiler room

Block filler throughout ‘D’ wing

Framing walls at the library

Framing the clock tower

Veneer starting East of the front entrance