EHS Building Project

 May 27, 2005 Photos
(click on photo to see a larger image)

Preparing to start veneer East elev. ‘H’ wing

Column wraps started in the cafeteria

Control panels at ‘B’ mechanical mezz

Stairs in place ‘H’ wing

Prep for veneer at the cafeteria

Welding bar joists at the penthouse

Shrubs coming well at the berm

Mud set floor at the bathroom at
locker room area; ready for tile