November 4, 2004 Photos
(click on photo to see a larger image) |

Underground conduit at area ‘F’ |

Masonry at elevator at section ‘A’ |

Excavation for septic tanks
at the loading dock |

Masonry wall between the two gyms |

Main gym ready for slab placement |

Metal stud framing and dens-glass started |