October 7, 2005 Photos
(click on photo to see a larger image) |

Hydroseeding complete inside the track |

Gravel installed at the football field |

Light heads being installed at the Musco poles |

Vertical granite curb started |

Plumbing fixtures at area ‘D’ |

Masonry at the front entrance |