EHS Building Project

 September 2, 2005 Photos
(click on photo to see a larger image)

Installing underdrain for the football field

 

Grid in the corridor at area ‘B’

Painting in the choral room

Sprinkler being installed in the cafeteria

Placing intermediate steps at the auditorium

Return to EHS Building Page